Neglected end terrance remodeled and extended, planning approval for two storey side extension and single storey rear extension takes the main living to the rear with large open plan kitchen dining and en suite main bedroom with walk in wardrobe to the first floor. This property was in a poor state of repair and poorly […]
New build – Terrace of 4 dwellings
Demolition of redundant school and planing consent for terrace of four dwellings
Back garden to new build
An under utilised back garden becomes a building plot for a comfortable 5 bedroom, 4 bathroom detached family home with double garage. Design, planning and completed build in 14months. Completed early 2025.
- 1
- 2
- 3
- …
- 18
- Next Page »